Contact Us
TEL : +86-22-83835857
Fax: +86-22-28428089
E-mail: admin2@co-working.com.cn
Add: 2-2702 Jingcai Mansion Dagunan Road No.459 Hexi District, Tianjin China
Web:www.cwksteelpipe.com
Home > Knowledge > Content
En 10219 ASTM A500 Welded ERW Steel Pipe
Dec 21, 2017

Basic Info

  • Model NO.: ASTM BS EN DIN JIS GB

  • Technique: Cold Rolled/Cold Formed/Hot Finished/Cold Drawn

  • Surface Treatment: Bared, Oiled, Color Paint, 3lpe, or Other

  • Section Shape: Round, Square, Rectangular

  • Length: 5.8~12m or Upon Customer′ Requirements

  • Secondary or Not: Non-Secondary

  • Trademark: CWK

  • Origin: China Mainland

  • Type: Welded

  • Material: API 5L, Asme B36.10m-2004, ASTM A53m-2007, Bs En

  • Usage: Pipeline Transport, Special Purpose, Oil/Gas Drilling, Machinery Industry, Mining, Construction & Decoration

  • Item: En 10219 ASTM A500 Welded ERW Steel Pipe

  • Specification: CE, ISO, SGS AND SO ON

Product Description

Products Details
CommodityEN 10219 ASTM A500 Welded ERW Steel Pipe
Outer diameter    ERW / HFWLSAW / DSAWSSAW / HSAWRHSSHS
1/8 - 20 inch
(10.3 - 508 mm)
12 - 56 inch
(323.8 - 1,420 mm)
 8 - 126 inch
(219.1 - 3,200 mm)
40 x 20 mm
- 1,000 x 800 mm
15 x 15 mm
 - 1,000 × 1,000 mm
Wall thickness0.4 - 16 mm6.0 - 40 mm6.0 - 26 mm1.0 - 30 mm0.6 - 30 mm
Length5.8 ~ 12.0 m or upon customers' requirements
StandardGB/T 3091, GB/T 13793, ASTM A252, ASTM A53, ASTM A500, EN 10210, EN 10219, API 5L,
DIN 1626/1615, DIN 17120, etc.
GradeSS400, Q235, Q345, Q460, A572 Gr.50, A572 Gr.60, S235, S275, S355, Grade A/B, X42, X52,
X60, X70, etc.
SurfacePrime quality (bared, oiled, color paint, 3LPE, or other anti-corrosive treatment)
InspectionWith Chemical Composition and Mechanical Properties Analysis;
Dimensional and Visual Inspection, also with Nondestructive Inspection.
Applicationstructure, electric power transmission tower projects, piling, water, oil & gas pipeline engineering, mechanical industry, municipal projects, roads and its auxiliary facilities, etc.
PackingStandard export, in bulk / bundles / nylon fabric bags with seaworthy packing;
or according to customers' requestments.
Delivery Time1. 20-45 days after received deposit or confirmed L/C
2. Depends on your order quantity
Payment Terms1. T/T: 30% T/T advance, 70% balance copy of  B/L
2. L/C: at sight
3. T/T and L/C: 30% T/T advance, 70% L/C 
PortChina main port

We would like to assure you that our steel pipes are made from top quality materials and workmanship,
And we are 100% sure that you will be totally satisfied with your purchase.

Web: www.cwksteelpipe.com          

Email: admin2@co-working.com.cn


Previous: Alloy Steel Tube/Pipe Fittings Nipples and Coupling

Next: High Pressure Forged Steel Pipe Fittings